I also propose to form with hardwood blocks on concrete and from this room to the Gentlemen's Lavatory, the dimensions of which are also 19' x 10'9". The Lavatory is fitted with basins and dressing table for the toilet and a set of Urinals. Leading from the Lavatory are two Water Closets each 5'8" x 3'6". The walls to Lavatory and WCs, I also propose to face with white glazed bricks and to form the floor with tiles.

A Lantern can also be formed as described on page for Ladies Lavatory.

Access to Pier.

The access to Pier for Europeans is from General Waiting Hall as shown on Plan, and I would point out that the access for the native population being from the East and West sides from Connaught Road, no objection can follow in consequence of allowing coolies or other servants passing through the General Hall.

Attendants' Rooms.

The Attendants' Rooms are shown on Drawing No. 1 "First Floor Plan" and are described on page 4 of this report.

Roof over Pier.

I propose to construct a roof over the Pier for a distance of 90 feet from the wall of the Vestibule.

The roof to be supported with iron columns and trusses of an ornamental pattern and with ornamental cantilevers to support roof when over steps to the Landing stage etc.

The soffit of rafters to roof to be lined with V-jointed boarding placed diagonally, and the roof covered with tiles.

The roof to be finished with finials and cresting of an ornamental pattern along ridge.

On Drawing No. 4 (Section of roof) I show by dotted lines a lantern which can be constructed if so desired.

3, 4 and 7. Accommodation.

Ground Plan.

General Waiting Hall.

Ladies Waiting Room.

Ladies Lavatory.

Two Ladies WCs.

Gentlemen's Waiting Room.

The accommodation provided is as follows:-

25 feet diameter = 491 sq.ft.

23'0" x 17'6" = 402 sq.ft.

19'0" x 10'9" = 205 sq.ft.

5'8" x 3'6" = 38 sq.ft.

Gentlemen's Lavatory.

23'0" x 17'6" = 408 1/2 sq.ft.

19'0" x 10'9" = 205 sq.ft.

Two Gentlemen's Water Closets each 5'8" x 3'6" = 36 sq.ft.

First Floor Plan.

Bed Room.

Attendants' Living Room.

25'0" x 12' = 303 sq.ft.

18'9" x 12' = 203 sq.ft.

Bath Room.

12'11/2" x 7'8" = 91 sq.ft.

Forming

Edit History

2026-05-31 18:19:39 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
267 I also propose to form with hardwood blocks on concrete and from this room to the Gentlemen's Lavatory, the dimensions of which are also 19' x 10'9". The Lavatory is fitted with basins and dressing table for the toilet and a set of Urinals. Leading from the Lavatory are two Water Closets each 5'8" x 3'6". The walls to Lavatory and WCs, I also propose to face with white glazed bricks and to form the floor with tiles. A Lantern can also be formed as described on page for Ladies Lavatory. Access to Pier. The access to Pier for Europeans is from General Waiting Hall as shown on Plan, and I would point out that the access for the native population being from the East and West sides from Connaught Road, no objection can follow in consequence of allowing coolies or other servants passing through the General Hall. Attendants' Rooms. The Attendants' Rooms are shown on Drawing No. 1 "First Floor Plan" and are described on page 4 of this report. Roof over Pier. I propose to construct a roof over the Pier for a distance of 90 feet from the wall of the Vestibule. The roof to be supported with iron columns and trusses of an ornamental pattern and with ornamental cantilevers to support roof when over steps to the Landing stage etc. The soffit of rafters to roof to be lined with V-jointed boarding placed diagonally, and the roof covered with tiles. The roof to be finished with finials and cresting of an ornamental pattern along ridge. On Drawing No. 4 (Section of roof) I show by dotted lines a lantern which can be constructed if so desired. 3, 4 and 7. Accommodation. Ground Plan. General Waiting Hall. Ladies Waiting Room. Ladies Lavatory. Two Ladies WCs. Gentlemen's Waiting Room. The accommodation provided is as follows:- 25 feet diameter = 491 sq.ft. 23'0" x 17'6" = 402 sq.ft. 19'0" x 10'9" = 205 sq.ft. 5'8" x 3'6" = 38 sq.ft. Gentlemen's Lavatory. 23'0" x 17'6" = 408 1/2 sq.ft. 19'0" x 10'9" = 205 sq.ft. Two Gentlemen's Water Closets each 5'8" x 3'6" = 36 sq.ft. First Floor Plan. Bed Room. Attendants' Living Room. 25'0" x 12' = 303 sq.ft. 18'9" x 12' = 203 sq.ft. Bath Room. 12'11/2" x 7'8" = 91 sq.ft. Forming
Baseline (Original)
; 267 I also propose to form with hardwood blocks: on concrete) and from this room to the Gentlemen's Lavatory` the dimensions of which are also 19'.dź"; x: 10×9′′L) The Lavatory is fitted with basins and dressing table for the toilet: and a get of Urinals. Leading from the Lavatory are two Water Closets each 51.8′′ x 3,6". The walls to Lavatory' and F.Cs. I also propose to face with white glazed bricks and to form the floor with tiles. tory.1 A Lantern can also be formed as: described on page for Ladies Lava- Access to Pier. The access to Pier for: Europeans is from General Waiting Hall as shewn on Plan, and I would point out that the access for the native population being from the East and West sides from Connaught Roady no objection can follow in consequence of allowing coolies or other: Servants passing through the General Hall. Attendants Rooms,1 The Attendants' Rooms are shewn on Drawing No. 1 "First: Floor Plan" and are described on page 4 of this report. Roof over Pier:: I propose to construct a roof over: the Pier for a distance of 90 feat from the wall of the Vestibule.) The roof to be supported with iron columas: and trusses of an ornamental pattern and with ornamental cantilevers to sup- port roof when over steps to the Landing stage etc. The soffite of rafters to roof to be lined with "V*: jointed boarding' placed diagonally, and the roof covered with tiles.) The roof to be finished with frön fiñials. and crasting of an ornamental pattern along ridge.) On Drawing No. 4' (Section of roof) I shew by dotted lines a lantern which can be constructed if so desired. 3,4' and 7.1 Accommodation. Ground Plað. General Waiting Hall. Ladies Waiting Room Ladies Lavatory Two Ladies .Cs, sach Gentlemen's: Waiting Room are Details of above shewn on Drawings Nos.1 The accommodation provided is as follows:- 25 feet diameter: = 491 sq.ft.: 23*.0" x 17*.6" *, 402ź do. 19*. táx. 10*.9*; * 205ź do.1 5.8" x 3*.8": = 38 do. Gentlemen's: Lavatory 23*.0" x 17'.6". 19.0"x 10.9*. 4081⁄2 ap.1 *. 205Ź do. Two Gentlemen's: Water Closets each 5.8* x 3*.6" # 36% do. First Floor Plan. do.1 Bed Room Attendants' Living Room 25.0" x 12'.dź′′ 303 18'.9" x 12', 1₤"=, 203 do. do. do. Bath Roon to12'.11⁄2"x 7',8′′ =, 91 Forming
2026-05-31 18:19:39 · Baseline
View content

;

267

I also propose to form with hardwood blocks: on concrete) and from this room to the Gentlemen's Lavatory` the dimensions of which are also 19'.dź"; x: 10×9′′L) The Lavatory is fitted with basins and dressing table for the toilet: and a get of Urinals. Leading from the Lavatory are two Water Closets each 51.8′′ x 3,6". The walls to Lavatory' and F.Cs. I also propose to face with white glazed bricks and to form the floor with tiles.

tory.1

A Lantern can also be formed as: described on page for Ladies Lava-

Access to Pier.

The access to Pier for: Europeans is from General Waiting Hall as shewn on Plan, and I would point out that the access for the native population being from the East and West sides from Connaught Roady no objection can follow in consequence of allowing coolies or other: Servants passing through the General Hall. Attendants Rooms,1

The Attendants' Rooms are shewn on Drawing

No. 1 "First: Floor Plan" and are described on page 4 of this report. Roof over Pier::

I propose to construct a roof over: the

Pier for a distance of 90 feat from the wall of the Vestibule.)

The roof to be supported with iron columas:

and trusses of an ornamental pattern and with ornamental cantilevers to sup- port roof when over steps to the Landing stage etc.

The soffite of rafters to roof to be lined with "V*: jointed boarding' placed diagonally, and the roof covered with tiles.)

The roof to be finished with frön fiñials.

and crasting of an ornamental pattern along ridge.)

On Drawing No. 4' (Section of roof) I shew

by dotted lines a lantern which can be constructed if so desired.

3,4' and 7.1 Accommodation.

Ground Plað.

General Waiting Hall. Ladies Waiting Room Ladies Lavatory Two Ladies .Cs, sach Gentlemen's: Waiting

Room

are

Details of above shewn on Drawings Nos.1

The accommodation provided is as follows:-

25 feet diameter: = 491 sq.ft.: 23*.0" x 17*.6" *, 402ź do. 19*. táx. 10*.9*; * 205ź do.1 5.8" x 3*.8": = 38 do.

Gentlemen's: Lavatory

23*.0" x 17'.6". 19.0"x 10.9*.

4081⁄2 ap.1

*. 205Ź

do.

Two Gentlemen's: Water Closets each

5.8* x

3*.6"

#

36% do.

First Floor Plan.

do.1

Bed Room

Attendants' Living Room 25.0" x 12'.dź′′ 303 18'.9" x 12', 1₤"=, 203

do.

do.

do.

Bath Roon to12'.11⁄2"x 7',8′′ =, 91

Forming

Comments